My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/18/2017
LFImages
>
County Clerk
>
Board Minutes & Agendas
>
Board of Commissioners
>
Agendas & Minutes
>
Prior Years
>
2017
>
04/18/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2017 12:26:13 PM
Creation date
6/20/2017 12:26:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. All waste, rubbish and debris, if any, must be completely cleared from the <br /> above-described real estate as soon as practical and said real estate must, at all times, be kept in a <br /> clean and neat condition. <br /> 2. No uses under this resolution shall result in an unreasonable hazard or nuisance to the <br /> adjacent landowners or to the general public. <br /> 3. Nothing in this grant of conditional use shall be construed as a grant of right, <br /> authority or permit to allow any use of land, materials or methods which violate any state or <br /> federal law or rule or regulation of a federal, state or local agency other than as specifically set <br /> forth herein. The applicant shall be required, as a condition of this permit, to comply with all <br /> applicable state and federal laws and regulations including, but not limited to, those pertaining to <br /> telecommunications, water quality, surface drainage, flood control and protection, and <br /> environmental quality and protection. Applicant shall, at all times, comply with any and all <br /> tower marking and illumination requirements of the Federal Aviation Administration and the <br /> Federal Communications Commission. <br /> 4. The term of this conditional use permit shall be for a period of five (5) years <br /> beginning March 27, 2017, but may be terminated if applicant fails to comply with any of the <br /> conditions, restrictions and obligations set forth herein. In the event of noncompliance, the Hall <br /> County Board of Supervisors shall notify the applicant in writing setting forth the specific area or <br /> areas of noncompliance. If the applicant fails to cure any such noncompliance within 30 days <br /> after receiving said notice, the Hall County Board of Supervisors shall hold a hearing to consider <br /> the suspension, revocation or termination of this permit of conditional use. <br /> 5. Applicant shall erect, construct, operate and maintain said microwave <br /> telecommunications tower and related structures in accordance with applicant's application for <br /> conditional use and in accordance with applicable Hall County Building Codes. <br /> This Conditional Use Permit is hereby granted this 18th day of April, 2017, subject to the <br /> terms, conditions and restrictions above set forth. <br /> Resolution moved by Supervisor (l,n e Q c r dsp v\ . <br /> Seconded by Supervisor E(1 cat AvJ <br /> Vote: <br /> Supervisor Arnold: For t( ; Against ; Abstained ; Not Present <br /> Supervisor Bredthauer: For •,( ; Against ; Abstained ; Not Present <br /> Supervisor Lancaster: For N( ; Against ; Abstained ; Not Present <br /> Supervisor Lanfear: For k ; Against • Abstained Not Present <br /> Supervisor Quandt: For V ; Against ; Abstained_ ; Not Present <br /> Supervisor Richardson: For ; Against ; Abstained • Not Present <br /> Supervisor Schuppan: For c ; Against ; Abstained ; Not Present <br />
The URL can be used to link to this page
Your browser does not support the video tag.