My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/08/2015
LFImages
>
County Clerk
>
Board Minutes & Agendas
>
Board of Commissioners
>
Agendas & Minutes
>
Prior Years
>
2015
>
09/08/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2016 12:56:30 PM
Creation date
12/22/2015 12:23:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID OPENING — Casey Sherlock returned with the bid tabs for the asphalt overlays for 2015 <br /> and he stated he reviewed the bids and there were no errors or inconsistencies. He <br /> recommended to accept the bid from Gary Smith Construction for $533,811.80. <br /> Schuppan made a motion and Lanfear seconded to accept the bid from Gary Smith <br /> Construction for$533,811.80. Casey stated that there has been a drop in oil prices. This is <br /> phase#1 and the second phase will be done in the spring. Arnold, Lancaster, Lanfear, Purdy, <br /> Quandt, Richardson and Schuppan all voted yes and none voted no. Motion carried <br /> 8. 10:30 AM — PUBLIC HEARING --CONDITIONAL USE PERMIT FOR VONTZ PAVING FOR <br /> SAND AND GRAVEL PIT, TEMPORARY ASPHALT/CONCRETE PLANT— Purdy made a <br /> motion and Richardson seconded to open the public hearing for the conditional use permit for <br /> Vontz Paving. Arnold, Lancaster, Lanfear, Purdy, Quandt, Richardson and Schuppan all voted <br /> yes and none voted no. Motion carried <br /> Loran Humphrey, Zoning Director received the application for the conditional use permit on July <br /> 15 at the Alda interchange on 180. He showed pictures of the area and the proposed location. <br /> He received a letter from James B Luers, and read it into the record in opposition to the request <br /> for the conditional use permit. <br /> The following letters were read into the record. Gary L. Krapu, Ph.D opposed to the proposed <br /> industrial site <br /> Brice Krohn Senior Director with the Crane Trust opposed to the proposed site <br /> Patricia Halderman Lincoln, NE opposed to the proposed site <br /> Dr. Richard Beilfuss President and CEO International Crane Foundation - opposes <br /> Timothy Sheeghy, Omaha, NE opposed to the proposed site and noted the on line petition <br /> Mr. Humphrey stated that this would be seasonal. Mr. Zitterkopf reminded the board that <br /> whether it is approved or not they have to state the reason why. <br /> Jay Vontz, Sean Vontz and Brad Vontz were present and presented information to the board <br /> members. They addressed the following: <br /> • Proper permits regarding wetland delineation, US Army Corps of Engineers and <br /> US Fish &Wildlife Service <br /> • Current traffic counts on 180 daily, traffic on Alda road daily, they would have an <br /> average of 25 loads daily <br /> • Rationale for site i.e. Location, zoning, plant site, good gravel cores and access <br /> to gravel <br /> • Noted reality of gravel pit <br /> • Noted the reality of asphalt plan they follow NDEQ regulations <br /> • Pit development and past gravel pits noted other property that has been <br /> purchased by Platte River Recovery and has been developed <br /> Mr. Vontz stated they have gone through the proper channels and have the permits. If their <br /> current site is out of gravel they look for land that has access to gravel. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.